Construction Scheduling Manager
77 Days Old
Company: Barton Malow Builders
Job Location: Southfield, MI
Position: Scheduling Manager
REQ ID: 11432
POSITION SUMMARY
The Planning & Scheduling Manager position is considered multiple project and/or business unit support. Planning & Scheduling Manager must be a flexible and adaptable team player, as well as have strong communication and client service skills. Must develop relationships with operational personnel to drive process and deliver results.
KEY JOB RESPONSIBILITIES:
Leads planning & scheduling efforts and assists project teams in the preparation of project schedules and has ability to progress schedule status that facilitates subcontractor and owner reporting
Has ability to establish baselines, draft narratives and perform variance, float and delay analysis
Ability to forecast a project from a schedule perspective and align with cost and manhour projections
Supervises and mentors Planning & Scheduling Team Members
Drive Change management process to properly document scope and/or unforeseen changes related schedule on each individual project, assisting with the incorporation of fragnets and TIA preparation
Clearly communicate when risk factors arise on a project to on-site personnel and/or upper management to ensure proactive action is taken.
REQUIRED KNOWLEDGE, EDUCATION, EXPERIENCE, SKILLS, AND ABILITIES: Six to eight years of Planning & Scheduling experience related to engineering or construction
Bachelor's Degree in Engineering, Construction Management or Business Management
Proficient with Oracle P6 Professional
Intermediate skills in MS Office skills, Word, Excel, Outlook, and Internet Explorer
Basic skills in Bluebeam, Prolog and Box
Ability to effectively manage and communicate workload with all members of the team.
Effective time management and organizational skills while paying attention to detail
Ability to identify, track, and complete work tasks in a timely manner
Experience with Stadium Construction, Design-Build, & Fast-Tracking Preferred
WORK ENVIRONMENT/JOB CONDITIONS:
This job may be performed in the office or on the jobsite and requires frequent sitting (often working on a computer), frequent walking, standing, bending, and reaching. Due to computer usage, there may be repetitive motions of the hands and wrists. The person performing this job must be able to navigate the jobsite and is expected to be able to comply with all safety regulations in the office and on the jobsite. Additionally, this person may be requested to work overtime and weekends, as the project / business unit responsibilities requires.
Barton Malow is an equal opportunity employer and does not discriminate on the basis of race, color, national origin, sex, religion, age, disability, sexual orientation, gender identity, veteran status, height, weight or marital status.
Unsolicited Resumes from Third-Party Recruiters: We do not accept unsolicited referrals from third-party recruiters unless such recruiters are engaged and under contract to provide candidates for a specified opening. Any unsolicited resumes submitted without prior agreement will be considered the property of Barton Malow with the right to engage at our sole discretion without any obligations or fees owed.
- Location:
- Southfield, MI, United States
- Category:
- Management Occupations